Design and Prototyping:

Develop the design for the cooling pad, considering factors such as size, shape, materials, and cooling technology (gel, phase change materials, airflow, etc.).

Create prototypes to test the design's effectiveness and gather feedback for improvements.

Material Sourcing and Preparation:

Source materials required for cooling pad production, including outer fabric, inner cooling materials (gel, PCM), foam padding, and any additional components.

Ensure that materials meet quality standards and are suitable for the intended purpose.

Prepare materials for the production process, such as cutting fabric to size.

Cutting and Sewing:


Use automated cutting machines or manual cutting methods to cut fabric and other materials into precise shapes according to the design specifications.

Sew the cut pieces together to form the outer shell of the cooling pad, ensuring proper stitching and reinforcement for durability.

Filling and Assembly:

Integrate cooling materials into the pad, whether it's gel packs, PCM inserts, or other cooling technologies.

Assemble additional components such as straps, zippers, or covers if necessary.

Ensure proper alignment and attachment of all components to maintain the integrity of the cooling pad.

Quality Control and Testing:

Implement quality control measures throughout the production process, including visual inspection of materials, stitching, and assembly.

Conduct testing on finished cooling pads to ensure they meet performance standards for cooling effectiveness, durability, and safety.

Test for leaks or defects in cooling materials and ensure proper functionality of any added features (such as straps or zippers).

pad manufacturing line

Related News

More >
Get the latest price? We'll respond as soon as possible(within 12 hours)
  • This field is required
  • This field is required
  • Required and valid email address
  • This field is required
  • This field is required